Phase 1
-
Gather baseline information by identifying potential environmental, technology, and economic impacts of the proposed alternatives.
​​
-
These include the positive and negative impacts of the proposed projects and possible mitigation and enhancement measures.
Phase 1
-
Collect and review historical data from the treatment plant
-
We will evaluate the historical data to determine the past and current performance of the treatment plant.
-
This will help us to determine line of action for effective system optimization
-
Review overall treatment processes if available
-
.
Phase 1
-
Distribution
-
Collect and review historical data for the distribution system
-
Create a Standard Operating Procedure (SOP) for compliance sampling in the distribution system water if needed (optional)
-
Review the facility distribution system sampling point for compliance
-
Phase 2
-
Establish discussions and consultations with the advocate and stakeholders; engage in case studies and literature review; field visits for consultations and observations; data analysis and report writing.
​
-
Gather data already available in the public domain backed up by observations in the field.
Phase 2
-
Evaluate current treatment processes
-
Review system plant design if available
-
Review current system operation strategies
-
System feed, inter-stage and concentrate pressures
-
System flows (by stage if available)
-
Feed water and permeate water quality
-
-
Phase 2
-
Corrosion Control
-
Review current corrosion control strategy if available
-
Provide new corrosion control and monitoring strategies
-
Data collection to validate treatment changes
-
Phase 3
-
Make recommendations that will provide the best outcome in meeting project objectives
​​
-
Advocate that stakeholders will agree to make sure the project approach is participatory.
Phase 3
-
Create a Standard Operating Procedure (SOP) for process water sampling and process control
-
This Standard Operating Procedure will be developed if needed. (optional)
-
-
Create a sampling plan and analytical parameters
-
For water analysis from the source water, Treatment influent, POE and distribution system
-
Phase 3
-
End users piping and accessories investigation
-
Provide effective water flushing strategy to manage water age in the distribution system
-
Identify and investigate the requirements for free lead plumbing parts for POU use
-
Phase 4
-
Run the treatment plant with the operator using revised operation strategies
-
This is to confirm systems are operating at proper operating ranges
-
Provide recommendation as to treatment plant operation
-
Operate the treatment plant at the proposed recommended operation strategies